A matching set of three freestanding patio pieces: a 48 x 16 x 17 in backless bench, a 36 x 20 x 16 in coffee table and a 16 x 16 x 20 in side table. Square-cut PT frames, supported slatted tops and open drainage gaps share one stock-packed shopping list. Longitudinal ripping is required; each piece has its own assembly sequence.
Before you buy anything, it helps to know three things: how big each piece is, what you’ll bring home from the store, and how the assembly goes. Here they are for the Three-Piece PT 2x4 Patio Set, straight from the plan.
How big is it?
This plan is a set of pieces, each built on its own. The finished sizes, width × depth × height:
- Bench: 48 × 16 × 17 in (122 × 41 × 43 cm)
- Coffee table: 36 × 20 × 16 in (91 × 51 × 41 cm)
- Side table: 16 × 16 × 20 in (41 × 41 × 51 cm)
Measure the spot where each one will stand before you start.
What you’ll buy
The lumber and screws come to about $102 at the prices we saw (Sep 27 – Nov 2, 2026). Prices change, so check your own store. Not in that figure: the wood preservative and stain in the list below, sandpaper, brushes and other supplies. Count them in before you shop.
| Qty | What |
|---|---|
| 15 | 2x4 PT, 8 ft |
| 1 box | #9 x 2-1/2 in tan torx flat-head deck screws |
| 1 | Copper-Green 1 gal. exterior wood preservative |
| 1 | Ready Seal exterior wood stain and sealer |
| 2 | Harbor Freight HERCULES 9 x 11 in |
| 2 | Harbor Freight 1 in. chip brush |
The shopping list names what to buy; the cut list in the plan turns those boards and sheets into parts. Check both before your first cut.
Tools you need
- Tape measure
- Speed square
- Pencil
- Level
- Miter saw
- Table saw (the 16 top slats are ripped lengthwise, so plan for a saw that can do it)
- Flat, rigid assembly surface and a straight reference edge
- Drill/driver
- Countersink bit
- Drill bits (1/8 in and 5/32 in for pilot holes)
- T25 star driver bit
- Bar clamps (at least 6, 12 in or longer)
- Sandpaper
- Small paintbrush
- Safety glasses
- Hearing protection
- Work gloves
- Dust mask
- Respirator or paint mask rated for spray paint
- Reusable gap spacers cut from sound project offcuts to the declared drainage gap
- Pin moisture meter suitable for treated lumber
How the build goes
The plan has 22 steps, each with a drawing and the parts it uses.
- Bench: select stock and cut the parts
- Bench: build the front leg frame flat
- Bench: build the rear leg frame flat
- Bench: raise the frames and attach the end ties
- Bench: fit the top bearers
- Bench: space and fasten the top slats
- Bench: check the completed piece
- Coffee table: select stock and cut the parts
- Coffee table: build the front leg frame flat
- Coffee table: build the rear leg frame flat
- Coffee table: raise the frames and attach the end ties
- Coffee table: fit the top bearers
- Coffee table: space and fasten the top slats
- Coffee table: check the completed piece
- Side table: select stock and cut the parts
- Side table: build the front leg frame flat
- Side table: build the rear leg frame flat
- Side table: raise the frames and attach the end ties
- Side table: fit the top bearers
- Side table: space and fasten the top slats
- Side table: check the completed piece
- Set: apply the matching finish and place each piece
Before you start
- Compare the shopping list with the stock sizes your store actually carries.
- Check every measurement against your own materials before cutting.
- Read the safety notes at the front of the plan and wear the protective gear it lists.
What the plan includes
- Preparation packet PDF (shopping list, cut list, tools), 10 pages
- Build guide PDF, 54 pages
- Preparation packet PDF, metric (mm) (shopping list, cut list, tools), 11 pages
- Build guide PDF, metric (mm), 54 pages
- Offline animated 3D build guide (ZIP; open guide.html in a web browser; guide-metric.html for mm)
It is a digital build plan: nothing physical ships. See the plan.
These plans are for planning and personal use. They are not engineered drawings and do not claim compliance with any building code. Check local rules and use your own judgment on site.
General planning guidance. Follow your chosen plan and tools’ instructions; ask about unclear dimensions or substitutions before cutting.