A swept cedar roof shelters a shallow slatted tray in a rectangular base. Lift the tray between the corner posts, then tilt it out through a long open side for cleaning. A wooden turn button keeps the seated tray from sliding forward. Add your own hanging cord around the base frame.
Before you buy anything, it helps to know three things: how big the finished build is, what you’ll bring home from the store, and how the assembly goes. Here they are for the Sweep-Roof Bird Feeder with Lift-Out Seed Tray, straight from the plan.
How big is it?
The finished size is 16 × 13-1/8 × 13-5/8 in (41 × 33 × 35 cm), width × depth × height. Measure the spot where it will stand before you start.
What you’ll buy
The lumber and screws come to about $35 at the prices we saw (Sep 27 – Oct 5, 2026). Prices change, so check your own store. Not in that figure: sandpaper, which you may already have.
| Qty | What |
|---|---|
| 6 | Cedar fence picket, 6 ft |
| 1 box | #8 x 1-5/8 in tan star flat-head deck screws |
| 1 | 3M Pro Grade Precision 9x11 in 220-grit fine sheets |
The shopping list names what to buy; the cut list in the plan turns those boards and sheets into parts. Check both before your first cut.
Tools you need
- Tape measure
- Speed square
- Pencil
- Level
- Miter saw
- Table saw
- Jigsaw
- Drill/driver
- Countersink bit
- Drill bits for the #8 deck screws (1-5/8 in): 5/32 in clearance bit, 1/8 in pilot bit, 7/64 in bit to test
- T20 star driver bit
- Bar clamps (at least 2, 24 in or longer)
- Sandpaper
- Safety glasses
- Hearing protection
How the build goes
The plan has 24 steps, each with a drawing and the parts it uses. The plan’s own estimate is about 5–8 hours; treat it as an estimate.
- Check the stock and cut the frame pieces
- Cut the cleats, end rails and small blocks
- Lay out and cut the sweeping gables
- Prepare the roof strips and ridge cap
- Build the left end frame flat
- Fit the left swept gable
- Build the right end frame flat
- Fit the right swept gable
- Stand the end frames and fit the side rails
- Fit the inside tray cleats
- Check the frame before fitting the tray
- Measure the tray opening and finish its cuts
- Assemble the tray floor and end rims upside down
- Fit the low front and rear lips
- Seat the tray and check cleaning access
- Install the outer roof facets
- Install the shallow roof facets
- Install the middle roof facets
- Install the upper roof facets
- Bridge the roof with the ridge cap
- Fit the wooden turn-button keeper
- Sand the feeder and check the drainage
- Add a hanging cord and check the setup
- Refill and perform the final access check
Before you start
- Compare the shopping list with the stock sizes your store actually carries.
- Check every measurement against your own materials before cutting.
- Read the safety notes at the front of the plan and wear the protective gear it lists.
What the plan includes
- Preparation packet PDF (shopping list, cut list, tools), 9 pages
- Build guide PDF, 42 pages
- Preparation packet PDF, metric (mm) (shopping list, cut list, tools), 10 pages
- Build guide PDF, metric (mm), 42 pages
- Offline animated 3D build guide (ZIP; open guide.html in a web browser; guide-metric.html for mm)
It is a digital build plan: nothing physical ships. See the plan.
These plans are for planning and personal use. They are not engineered drawings and do not claim compliance with any building code. Check local rules and use your own judgment on site.
General planning guidance. Follow your chosen plan and tools’ instructions; ask about unclear dimensions or substitutions before cutting.