Give cats that prefer separate sleeping spaces their own room, front entrance and rear escape beneath a shared removable roof. A solid divider, raised floor, enclosed optional floor insulation and open cleaning access make daily care straightforward.
Before you buy anything, it helps to know three things: how big the finished build is, what you’ll bring home from the store, and how the assembly goes. Here they are for the Duplex Outdoor Cat Shelter, straight from the plan.
How big is it?
The finished size is 44 × 24 × 20 in (112 × 61 × 51 cm), width × depth × height. Measure the spot where it will stand before you start.
What you’ll buy
The shopping list comes to about $188 at the prices we saw (Sep 27 – Oct 8, 2026). Prices change, so check your own store.
| Qty | What | At the prices we saw |
|---|---|---|
| 1 | 1x2 SPF, 8 ft | $2.50 |
| 4 | 2x2 SPF, 8 ft | $11.48 |
| 1 | 2x4 PT, 8 ft | $4.78 |
| 1 | 1 in foam board, 4 × 8 ft | $17.97 |
| 2 | 1/2 in plywood, 4 × 8 ft | $80.70 |
| 1 box | #8 x 1-1/4 in tan star flat-head deck screws | $10.97 |
| 1 box | #8 x 1-5/8 in tan star flat-head deck screws | $10.97 |
| 1 | BEHR PREMIUM PLUS 1 qt satin enamel exterior paint and primer | $24.98 |
| 1 | 3M Pro Grade Precision 9x11 in 120-grit medium sheets | $6.98 |
| 1 | DuMOR 2-string compressed wheat straw bale | $16.99 |
The shopping list names what to buy; the cut list in the plan turns those boards and sheets into parts. Check both before your first cut.
Tools you need
- Tape measure
- Speed square
- Pencil
- Level
- Circular saw
- Straightedge cutting guide
- Jigsaw
- Drill/driver
- Countersink bit
- Wood drill bits for pilot holes, screw clearance holes and jigsaw starter holes
- T20 star driver bit
- Bar clamps (at least 4, 24 in or longer)
- Sandpaper
- Small paintbrush
- Safety glasses
- Hearing protection
- Work gloves
- Dust mask
- Utility knife
- Stable work supports and a flat work surface
- Cardboard pads
- Square scrap blocks and plywood offcuts
- Calipers
- Hand screwdriver matching the roof screws
- Drill depth stop
- Dust brush and wiping cloth
- Small container for roof screws
- Wide scrap support for narrow stock
How the build goes
The plan has 16 steps, each with a drawing and the parts it uses. The plan’s own estimate is about 8–12 hours; treat it as an estimate.
- Check the stock and cut the base
- Cut the wall panels and roof
- Prepare the framing and screw holes
- Build the protected raised base
- Build the left side flat
- Build the right side flat
- Build the divider flat
- Raise and secure the wall assemblies
- Fit the front rails and sill
- Fit the entrance panel
- Fit the rear rails and sill
- Fit the escape panel
- Fit the lift-off sloped roof
- Paint the exterior and allow full cure
- Choose the site and check the empty shelter
- Add straw and establish the cleaning routine
Before you start
- Compare the shopping list with the stock sizes your store actually carries.
- Check every measurement against your own materials before cutting.
- Read the safety notes at the front of the plan and wear the protective gear it lists.
What the plan includes
- Preparation packet PDF (shopping list, cut list, tools), 15 pages
- Build guide PDF, 46 pages
- Preparation packet PDF, metric (mm) (shopping list, cut list, tools), 15 pages
- Build guide PDF, metric (mm), 46 pages
- Offline animated 3D build guide (ZIP; open guide.html in a web browser; guide-metric.html for mm)
It is a digital build plan: nothing physical ships. See the plan.
These plans are for planning and personal use. They are not engineered drawings and do not claim compliance with any building code. Check local rules and use your own judgment on site.
General planning guidance. Follow your chosen plan and tools’ instructions; ask about unclear dimensions or substitutions before cutting.